Saturday, 15 September 2012
Friday, 14 September 2012
Risk assessment form
Standard Risk assessment Form (Management of Health and Safety at Work Regulations 1999)
Activity Assessed: Unit 3
Date: 13th June
Review by Date:
|
Project Name / Skyfall Opening Sequence
Assessed by: Mr Haycocks
Authorised by: Mr Haycocks
|
|||
Potential Hazards
|
Level of Risk
|
Existing Control Measures
|
Additional Measures required
|
|
Wires
|
Medium Risk
|
Wire Covers.
|
Tape Down wires.
|
|
Eye-Strain
|
Low Risk
|
Take a break.
|
Sit a reasonable distance away from the computer.
|
|
Repetitive straining
|
Low risk
|
Take a break.
|
Use ergonomic keyboard.
|
Thursday, 13 September 2012
Wednesday, 12 September 2012
Tuesday, 11 September 2012
Monday, 10 September 2012
Meeting 1
Meeting Proforma
Production Meeting No: 1
Date: 18th October 2012
Group members present: 1
Agenda:
Meeting Number: 1
Members are sticking to their original role,
but they are not all attending, seeing as one of them as got broken ribs so he
can’t come into school so he can’t attend all of the lessons.
This means that I am having to do more
work, but I am ok with this because it is not his fault that he can’t attend
the lessons, but when he does attend lessons he shall do some of the work to
help me out.
The production:
The production isn’t doing to well in relation to the schedule because I’ve had to do a lot of the work by myself, and this makes it hard because I’m not sure what ideas to use for the product. We have had to change a lot of things, because originally we were going to use cameras to get pictures for the opening sequence, but then we decided it will work better if we create the product on Macs using the internet and after effects.
We have no dates for shooting and recording
because of the fact that we will not be shooting or recording because we will
be creating the product mainly on after effects, if there is a need for
recording, then we will ask our teacher if we may leave to film anything necessary,
and we will change the equipment needed.
We have got each others mobile numbers, so
we can tell each other what design we want for the product, and we both know
the password to the blog so that we can both access the blog when the other is
not present.
Minutes From Meeting:
1.
We found that I will have to do
the work by myself for a while because of the injury that occurred to the other
member.
2.
We Found that we are behind the
schedule and have to hurry up to catch up to the schedule, we can do this by
staying behind after school, and at dinner times.
3.
We found that we have no need